Signing of the contract

A contract was signed with the winning company “SPICE-BUD” to begin repair and construction work in the city of Rubizhne.

On September 16, after all tender procedures, a contract was signed with the winning company “SPICE-BUD” on the basis of the State Institution “Luhansk Taras Shevchenko National University” to start construction work at the main facility in the city of Rubizhne.

The contract was signed by: from the private enterprise “SPICE-BUD” – director Andrii Bushniak; from the side of the university – the Rector Serhii Savchenko.
The overhaul period is 2 years.

This document has been prepared with the financial assistance of the European Union. The content of this document is the responsibility of the SI “Luhansk Taras Shevchenko National University”, and in no case can be considered as the position of the European Union.